Filter market: Months:
Themes & growth Feature launches Product roadmap activity Content: planned Content: published Referrals Charger campaign (store) Battery (store) Energy contract (store) Integration status: Live In progress / labs / alpha Not started Blocked Paused

Notes & suggestions

Source files

GS Commercial calendar 2026Google Sheet · growth + store sales, global & per market N Integration Roadmap (2026) - Master RegistryNotion database · all device integrations PR Product Roadmap 2026 (H2)Google Slides · delivery cycles C10–C13 SEO SEO Content Plan Q3Google Sheet · article publish dates per market

Update log

4 Aug 2026Scheduled refresh, reconciling an unfinished 31 Jul draft. Notion integration roadmap re-synced live: confirmed 9 items already updated in the unfinished 31 Jul draft were still accurate (XPENG, Porsche, BYD → target/status unchanged; Hyundai & KIA still Blocked at 28 Oct; MyEnergi-Zappi & Elli still In Labs at 12/19 Aug; Heidelberg unchanged; Solis still vendor-blocked at 12 Aug) — flags on Hyundai/KIA/Zappi downgraded from "verify before assuming stable" to confirmed, since today's live pull agrees. Found two real changes the 31 Jul draft had missed: Mercedes flipped BLOCKED → In Alpha (Enode resolved its migration plan; now an internal build-vs-Enode decision, not vendor-side) and Ecoflow flipped In Alpha → In Labs (DE unblocked — EcoFlow now supports all Germany models; other markets remain blocked to end of Aug). Commercial Sheet re-checked: added 3 minor Global hook labels (Green tech 2026 – Nov; Back to savings – Aug; Smart gifts – Dec), a new SE portal launch (Compricer Dynamic, 30 Jul) to Key activities, and a new SE Partnerships item (Mecenat Alumni & Student autumn wave, 24 Aug–29 Oct). Content calendar re-checked via the LLM reader sheet — all 41 H1 rows already matched, including the DE Wallbox-Förderung Done-flag/date fix from the 31 Jul draft (confirmed live: published 24 Jul, Done). Product Roadmap Slides checked — C10–C13 cycle dates unchanged; the "Installer & Asset led" workstream is still not added, pending Caroline's confirmation on timing (unchanged from 24 Jul). Not added: an SE "Podcast campaign" (Jun/Jul, already past) and three NO items (Tusenfryd, Polestar, Easee referral) that would need a new NO "Partnerships" section — flagged for Caroline rather than restructuring unilaterally.
28 Jul 2026Removed all named-individual "lead" fields (47 instances across every market) ahead of hosting this as a live internal URL — privacy review flagged that a first name is identifying even without a surname. Hover tooltips no longer show a Lead line at all (not replaced with role/title). See CLAUDE.md — do not re-add when re-syncing from the Sheet.
24 Jul 2026Restructured Netherlands to match the Sheet's NL tab more rigorously: added Seasonal campaign (Celebrating 10 years; Solar seasonal campaign; DPG Media solar charging; Smart Tier live), Growth: no offer (KV flex) (KV Flex Project, Jul), and Connectivity campaigns (GR for Homevolt Mar–Jun; GR for 3P Batteries Jul) — plus added the ERE Partnership launch (Joulo x Tibber) to Growth: discount/offer. Previously these were missing entirely; NL only had generic Growth/Integration/Store/CRM rows shared with other markets.
24 Jul 2026Fixed the "today" line: it was a hardcoded constant (stuck at week 26 / late June) instead of computed from the real date, so it silently went stale every time the file was reopened. Now computes live from the actual current date on each page load.
24 Jul 2026Full re-sync, new device. Commercial Sheet: ~50 new/changed items added across Global, SE, DE, NL, NO (SE store waves for Smart charging/Pulse/Battery; DE Pulse IR CRM sequence + 6 PR items + Overarching-topics extensions; NL Pulse/Battery waves; NO Store:Pulse + CRM reminders + a recurring Integration Newsletter; Global Feature launches + a new DE-battery Grid Rewards workstream). 4 source-sheet inconsistencies flagged in-note rather than silently resolved: Smart Mode Solar Preset launch date (Feb vs Mar across tabs), NL Yearly Energy Bill Campaign end date (DE-tab vs NL-tab disagree), DE "Ladebonus" EV campaign timing (Summer vs Oct–Dec), NO Easee campaign (July vs an already-done April instance).
24 Jul 2026Notion integration roadmap re-synced (39 records). Real changes: SolarEdge went Live/Complete (was In Labs, target 10 Jul); Peblar flipped In Alpha (was shown Blocked); Hyundai & KIA flipped Blocked (were Paused); XPENG target 31 Jul → 13 Aug; MyEnergi-Zappi target 15 Jul → 22 Jul; Elli target 31 Jul → 13 Aug (In Alpha, was In Progress). Added new dated entry Solarwatt (KiwiGrid), target 21 Oct, no status set yet. Also fixed pre-existing week-number bugs: Mini/Cupra (wk20→19), Jaguar (wk37→36), MG (wk36→35) — all now verified against the real Monday date.
24 Jul 2026Content calendar re-synced via the "LLM reader sheet" tab. All H1 articles for all 4 markets were already queued through 22 Sep; fixed a systematic off-by-one week bug affecting every article dated 1 Sep or later (across SE/NO/DE/NL), and recovered one missing Sweden article ("Hembatteri...") whose publish-date cell had been overwritten by a stray comment in the source sheet — date inferred from the weekly pattern, flagged as unconfirmed.
24 Jul 2026Product Roadmap (Slides) checked — C10–C13 cycle dates unchanged. Noted but not added: the deck now shows a new "Installer & Asset led" workstream track (Phase 1/2, fleet management, demo view) and several Recovery-loop / Departure Timer V2 discovery items with no clear cycle placement in the flattened text — needs Caroline to confirm timing before adding.
3 Jul 2026Integration roadmap re-scan: XPENG → 31 Jul, Porsche & BYD & Heidelberg → 19 Aug, Jaguar → 9 Sep, SolarEdge → 10 Jul. States unchanged; all other targets already matched.
3 Jul 2026Integration roadmap date review vs Notion: aligned Mini & Cupra to 15 May (wk20), MG & Peblar to 1 Sep (wk36). All other integration dates & states already matched.
3 Jul 2026Added Product Roadmap (Google Slides) — H2 delivery cycles C10–C13 with four workstream themes, placed under global initiatives, above the integration roadmap
3 Jul 2026Content plan: added Netherlands, Germany & Norway H1 articles via the new "LLM reader sheet" feed tab (live QUERY of H1 rows). All four markets now covered; green = planned, dark green when Done
3 Jul 2026Added Content calendar (SEO Content Plan Q3) — Sweden H1 articles with publish dates
2 Jul 2026Integration roadmap re-synced. Changes since 28 Jun: Mercedes target 30 Jun → 31 Aug; Zappi In Alpha → In Labs (30 Jun → 15 Jul); Solis 30 Jun → 15 Jul, now vendor-blocked; SolarEdge 29 Jun → 3 Jul; GoodWe & Sigenergy In Progress → In Alpha; Alfen Not Started → In Alpha (still undated, off calendar)
2 Jul 2026Commercial Sheet re-edited by Emma von Walden — H2 detail refined (Black Month breakouts, autumn energy bill, SAJ free-inverter offer, summer Go-e/Easee); already reflected in the commercial layer
28 Jun 2026Expanded all markets from the commercial Sheet — added Hooks, External events, CRM, Content, PR, Paid media, Partnerships & more (45 sections, 217 items)
28 Jun 2026Integration roadmap synced live from Notion (34 records, 30 with scheduled dates)
26 Jun 2026Commercial calendar last edited in Google Sheet (Emma von Walden)
28 Jun 2026Calendar rebuilt from both sources
15 Sep 2025Commercial calendar created

Timestamps reflect the source files at last sync. Re-open in Claude Code to re-pull and refresh this log.